Sector guide

Licensing project data: a guide for specialist subcontractors

Specialist contractors hold detailed records of their own trade that main contractor archives only skim: fabrication drawings, commissioning results, test certificates and trade-specific site imagery.

Guide
Specialist subcontractors
Reading time
2 min
Prepared by
Archive Introductions
Status
Independent referrer, not part of Mercor

Why specialist records are different

A main contractor's archive shows a project from the top down. A specialist's archive shows how one part of it was actually designed in detail, built, tested and handed over. For anyone building tools for a specific trade (MEP coordination, steel detailing, façade quality, groundworks progress), that depth is hard to find anywhere else.

What specialists typically hold, by trade

TradeTypical records
Mechanical and electricalCoordinated services drawings, schematics, commissioning and test results, O&M content, asset registers
Structural steel and framesFabrication and erection drawings, connection design, inspection and weld records
Façades and envelopeShop drawings, mock-up and testing records, installation photos, snagging
Groundworks and civilsSetting-out data, earthworks records, drone surveys, testing results
Fit-out and finishesSetting-out, product submittals, progress photos, snag lists

Across trades, method statements and risk assessments (RAMS), quality records and day-to-day site photos are common to almost everyone.

Your records vs the main contractor's

Specialists often work inside someone else's systems, so be clear about what's actually yours:

  • Documents you produced, such as shop drawings, RAMS, test results and your own photos, are generally your firm's to deal with, subject to your subcontract.
  • Documents you were given, such as the main contractor's programmes and the consultants' drawings, generally aren't.
  • Records in the main contractor's platform. If you submitted through their Procore or Autodesk project, the platform copy sits in their account. Your own originals, on your servers, are what you can work with.

Subcontract terms to check

  • Confidentiality clauses, which often flow down from the main contract.
  • Copyright or licence terms covering your design work (common on design-and-build packages).
  • Any client-specific restrictions passed down to you.

If in doubt, anonymised records (no client names, addresses or identifying details) are often easier to agree than identifiable ones.

Getting ready

  1. List completed packages from recent years, with the main contractor, the sector and where the records are stored.
  2. Separate your own records from documents others supplied.
  3. Note which projects have good imagery or test data.

Mercor's listing is aimed at companies with roughly 50 to 2,000 staff, which covers most established specialist contractors.

We mostly worked for one main contractor. Is that a problem?

Not in itself. What matters is what your subcontracts say about confidentiality and who owns the documents you produced.

Are commissioning and test records useful?

Structured, repeatable records such as test sheets and commissioning results are exactly the kind of data that's hard to find publicly.

Next step

Want an introduction?

We introduce UK construction, design and property firms with 50+ staff to Mercor's data-licensing marketplace. Mercor scopes the data, signs the NDA, removes or protects personal information and runs the export. Whether you license anything is up to you.

NoteWe're an independent referrer, not part of Mercor, and may earn a fee if you sign up.

Request an introduction